Control solids in filtrate
Select a structure that retains the required solids without creating unnecessary resistance.
BOYUN Industrial Filtration Solutions – Ceramic Vacuum Disc Filter
Select disc filter cloth bags by slurry size, permeability, cake release and chemical conditions, with fitting support for mineral dewatering applications.

BOYUN reviews cloth construction together with particle retention, air and liquid permeability, cake release, chemistry, cleaning and the installed sector.
Select a structure that retains the required solids without creating unnecessary resistance.
Balance cake pickup, drying and flow across normal and difficult feed conditions.
Evaluate surface behavior, blowback and mechanical contact under the real cycle.
Provide a used or unused reference cloth when possible, plus its construction record, sector drawing and slurry data. Material names alone do not define weave, finish, permeability or dimensional fit.
A useful quotation identifies the interface and operating duty instead of relying on a photograph or equipment name.
Record the installed condition so a replacement can be checked before dispatch.
Capture PSD, chemistry, solids and variation.
Set filtrate, cake, release and service-life goals.
Compare candidate constructions with a consistent method.
Check bag geometry, seams and fastening on the sector.
Record permeability loss, damage and replacement reason.
Cleaning and replacement intervals should respond to measured condition and the cause of blinding or damage.
Inspect nozzles, pressure, water quality and alignment without exceeding the cloth’s mechanical limits.
Relate early blinding or poor release to fines, solids, reagents and cycle changes.
Protect seams and surfaces from sharp sector edges, excessive tension and tools.
Stop the equipment and isolate all hazardous energy that can cause rotation, vacuum, pressure, stored mechanical movement, electrical energization or chemical exposure. Follow the site lockout and permit procedure; inspection and maintenance must be performed only by authorized personnel.
Use the equipment and service pages to confirm model, duty and replacement planning.
These answers support project preparation; the final recommendation depends on the actual duty.
Share the feed, throughput, operating target and site constraints. BOYUN will identify missing information and recommend testing, sizing or the appropriate equipment scope.