Review the released basis
Check current drawings, bill of materials, procedures and acceptance criteria before work.
BOYUN Industrial Filtration Solutions – Ceramic Vacuum Disc Filter
See how BOYUN controls incoming materials, welding, machining, assembly, coating, functional checks and final inspection for each disc filter project.

Quality control begins with the approved drawings, specifications, applicable standards, inspection and test plan, document schedule and agreed customer witness points.
Check current drawings, bill of materials, procedures and acceptance criteria before work.
Use identified equipment, traceable forms and responsible sign-off at defined stages.
Resolve deviations and compile the agreed dossier before shipment authorization.
The exact inspection plan depends on contract, equipment configuration and applicable standards.
| Stage | Examples of checks | Evidence to agree |
|---|---|---|
| Incoming material | Identity, dimensions, condition and specified supplier documents. | Receiving record, certificates or traceability record. |
| Fabrication and welding | Fit-up, dimensions, weld procedure and visual or specified examination. | Process records and inspection reports. |
| Machining | Shaft, sealing faces, bores, fits, runout and surface requirements. | Dimensional report and measuring-equipment identification. |
| Assembly | Orientation, fastening, lubrication, clearance, rotation and interfaces. | Assembly checklist and punch list. |
| Coating | Surface preparation, environmental conditions, system and thickness where specified. | Coating report and repair record. |
| Final release | Configuration, functional checks, marking, packing and document status. | Final inspection and release dossier. |
A recorded hold point protects features that cannot be fully inspected after assembly or coating.
Approve criteria, forms and witness points.
Verify materials and released documents.
Check fabrication, machining and assembly stages.
Record disposition, repair and re-inspection.
Verify equipment, packing and dossier status.
Avoid asking for a generic certificate pack. Identify the records and witness access needed for the actual project.
Review qualifications, manufacturing and commissioning evidence together.
These answers support project preparation; the final recommendation depends on the actual duty.
Share the feed, throughput, operating target and site constraints. BOYUN will identify missing information and recommend testing, sizing or the appropriate equipment scope.