Technical release
Confirm approved drawings, bill of materials, interfaces and inspection requirements.
BOYUN Industrial Filtration Solutions – Ceramic Vacuum Disc Filter
See BOYUN machining, welding, assembly, quality inspection and factory testing capabilities for vacuum and ceramic disc filters used in mining projects.

Each project should move through controlled drawings, material identification, fabrication, machining, assembly, coating and final inspection, with hold points matched to the customer’s quality plan.
Confirm approved drawings, bill of materials, interfaces and inspection requirements.
Check specified materials and retain the required identification or supplier documentation.
Control forming, fit-up and welding against released dimensions and procedures.
Verify shafts, sealing faces, sectors, drives and rotating interfaces before final assembly.
Record dimensional, functional, coating and documentation checks before shipment.
Procurement and engineering teams can request the documents relevant to their contract and inspection plan.
Approved dimensions, connections, utilities and performance basis define what is being built.
Project records can cover agreed incoming, in-process and final checks.
Shipment preparation, lifting considerations and site responsibilities are confirmed before dispatch.
Use current project photographs and inspection records to verify the relevant capability rather than relying on generic claims.



Quality-management context: ISO 9001 quality management systems.
Continue with documented credentials, testing and a project-specific inquiry.
Use these answers to prepare a useful discussion with BOYUN. Final equipment selection still depends on project data.
Share the slurry, dry throughput, feed solids, particle size and target cake moisture. BOYUN will identify missing data and recommend testing, sizing or a suitable filter configuration.