Backwash and operating cleaning
Verify clean-water quality, pressure or flow, valve timing and distribution against the equipment instructions.
BOYUN Industrial Filtration Solutions – Ceramic Vacuum Disc Filter
Maintain ceramic filter permeability with backwashing, ultrasonic cleaning and controlled regeneration based on slurry deposits and operating conditions.

Loss of permeability can come from fine-particle penetration, mineral scale, process reagent film, incomplete backwash, blocked channels or physical plate damage.
Verify clean-water quality, pressure or flow, valve timing and distribution against the equipment instructions.
Check equipment function, coverage and cycle condition using the controlled BOYUN procedure.
Select chemistry only after deposit, plate and site compatibility review.
This page intentionally does not publish a universal chemical, concentration, temperature or duration. Use the current BOYUN instruction for the identified plate and deposit, the chemical supplier SDS and the site’s risk assessment, permit, PPE, ventilation, containment, neutralization and disposal requirements.
Cleaning will not repair a cracked plate, failed connector, blocked internal passage or incorrect valve sequence.
Record the response after each approved step so the effective method is known.
Verify measurement, feed and cycle baseline.
Check valve, backwash, channels and plate integrity.
Use process history and analysis where needed.
Follow the controlled operating and safety instruction.
Compare permeability and filtration performance.
Remove damaged or unsafe plates from service and investigate why the damage occurred.
| Observation | Likely decision | Required review |
|---|---|---|
| Performance recovers after routine backwash | Continue controlled routine cleaning. | Confirm frequency, water quality and trend. |
| Performance responds only to periodic cleaning | Optimize the approved periodic schedule. | Identify deposit source and avoid over-cleaning. |
| No response despite correct flow and method | Investigate internal blockage or incompatible deposit. | Technical review before stronger chemistry. |
| Crack, chip, seal damage or leakage | Remove/replace according to equipment procedure. | Check scraper clearance, handling and installation. |
| Repeated short life | Treat as a system problem. | Review feed, chemistry, cleaning, mechanics and plate selection. |
Stop the equipment and isolate all hazardous energy that can cause rotation, vacuum, pressure, stored mechanical movement, electrical energization or chemical exposure. Follow the site lockout and permit procedure; inspection and maintenance must be performed only by authorized personnel.
Use plate, equipment and support pages together.
These answers support project preparation; the final recommendation depends on the actual duty.
Share the feed, throughput, operating target and site constraints. BOYUN will identify missing information and recommend testing, sizing or the appropriate equipment scope.