BOYUN Industrial Filtration Solutions – Ceramic Vacuum Disc Filter

Skip to main content
Documented engineering improvements

Disc Filter Research, Development and Patents

Review BOYUN’s disc filtration research capabilities, engineering process, documented technologies and improvements for mineral dewatering equipment.

BOYUN utility model patent document for filtration equipment
EvidenceControlled recordsDevelopmentProblem to verification
Controlled recordsEvidence
Problem to verificationDevelopment
Verify current recordPatent status
Duty-specificProject value
Evidence standard

Connect Every Technology Claim to a Verifiable Record

A patent image, engineering change and product benefit are different forms of evidence. BOYUN should publish patent number, title, type, applicant, legal status and official verification route only after the current record is checked.

Patent record

Verify bibliographic details

Confirm number, title, applicant, inventors, filing or grant data and current legal status.

Engineering record

Trace the implemented revision

Link the protected concept to released drawings, validation and affected equipment.

Customer value

State the applicable duty

Explain what was improved, under which conditions, and how it was measured.

Publication control

The visible certificate or patent image on this page is supporting media, not a substitute for a checked patent register. Unverified numbers or legal-status statements must not be added.

Development workflow

Move from Operating Problem to Controlled Release

Product development should retain the problem definition, calculation or test basis, risk review, design revision and verification evidence.

1

Define problem

Use field, test or manufacturing evidence.

2

Develop concept

Compare solutions, interfaces and failure modes.

3

Prototype or model

Test the critical function at an appropriate scale.

4

Verify design

Confirm performance, safety, durability and manufacturability.

5

Release and monitor

Control documents and review field feedback.

Engineering review

Questions Procurement and Engineers Should Ask

Useful technology evidence helps a project team understand applicability and risk.

What changed?Identify the component, control method or system arrangement.
Why was it changed?State the operating, energy, maintenance or manufacturing problem.
How was it verified?Provide the calculation, test or field-measurement basis available for review.
Where does it apply?Name the equipment family, duty and operating limits.
What is protected?Distinguish patent scope from broader marketing description.
What is current?Check document revision and patent legal status before publication.
Practical answers

Frequently Asked Questions

These answers support project preparation; the final recommendation depends on the actual duty.

Why is representative slurry data required?
Mineral names do not define filterability. Particle-size distribution, mineralogy, clay, reagents, solids and temperature can change cake formation, permeability and release. Use filterability testing when results matter commercially.
What should be sent for a preliminary review?
Provide dry-solids throughput, feed solids, particle-size data, target cake moisture, operating schedule, elevation and available utilities through the quote request.
Can BOYUN promise cake moisture from the mineral name alone?
No. A defensible target must be tied to representative feed data, test conditions, equipment scope and an agreed operating basis.

Define the Next Engineering Step

Share the feed, throughput, operating target and site constraints. BOYUN will identify missing information and recommend testing, sizing or the appropriate equipment scope.